Technology

The next generation of supplier diversity software.

AXI is a modern compliance platform built on the industry's leading web frameworks — Django and Python, with AI integrations, and engineered for the highest scalability. It's the new alternative to antiquated legacy systems agencies, authorities, and contractors have been stuck with for more than two decades — a single integrated workspace from scope unbundling and GFE through the final utilization report.

Watch a walkthrough Tour the platform
500K+
Certified firms in the AXI directory, refreshed daily
64
Unique certifications — from ACDBE to WBE
Django
Modern, AI‑ready Python stack — vs. legacy B2GNow architecture
SOC 2
Type II audited annually; FOIL / Audit ready
AXI project dashboard — Tower Renovation Project RFP12-2025
A comprehensive SaaS solution

One platform across the entire compliance lifecycle.

From initial scope unbundling through GFE outreach, certified firm identification, multi‑tier utilization reporting, workforce payroll, and Board‑ready impact reports — AXI replaces a stack of spreadsheets, email, and outdated diversity tools with a single integrated workspace.

Unbundle & scope

Automatically split cost estimates and RFP descriptions into searchable subcontracting opportunities.

Identify & match

Run scope‑specific searches across NAICS, NIGP, CSI, and keywords in every appropriate geographic area.

Outreach & GFE

Tracked outreach with project‑level inbox, surveys, RFP / bid management, and a defensible audit trail.

Plan Room

Project‑specific document, spec, and response file rooms with version history and view tracking.

Multi‑tier utilization reporting

Capture, validate, and report utilization across every tier of a contract or an entire portfolio.

Custom impact reporting

Templates and a report builder for impact, performance, and program reports across communities, and political districts.

Workforce tracking

Validate workforce payroll across trades, gender, and racial categories under -15‑A.

Waiver Wizard

Package, submit, and manage waivers — more than 400 processed to date.

Rachel Talcott
"AXI took construction goal setting and good faith efforts from a multi‑day process to less than an hour."
Rachel Talcott
MWBE Program Coordinator · SUNY Binghamton
Nationwide coverage

A validated, refreshed directory of every certified firm.

Validated directory

AXI's enriched directory contains half a million certified firms across the country with 64 unique business certifications — from Minority‑owned to Portuguese‑owned. Directories are automatically refreshed each day with archived copies attached to every project. Records are further enriched with bonding, insurance, and updated contact information.

Private directory options

Import and augment a client's existing vendor records with CRM tools. Capture intra‑organization documents, notes, history, and performance — accelerating institutional knowledge sharing and better utilization decisions.

Geographic intelligence

Census Bureau integrations let teams assess capacity and availability before goals are set — by ZIP, county, Senate, Assembly, Congressional, and City Council district.

AXI certified firm directory coverage across the United States
Holistic search

Finding every certified firm,
every time.

AXI's search process identifies every available certified firm for every project — whether the team is looking for Abatement contractors or Zamboni technicians. The system converts even the most limited scope description into simultaneous searches across all NAICS, NIGP, CSI codes, and keywords in each appropriate geographic sourcing area.

Holistic search

One scope produces dozens of structured queries — refined by district, capacity, and historical performance.

Audit trail

The entire process generates a documented audit trail and search report, archiving every directory and process used to withstand strict scrutiny or future audits.

GFE Scopes view with companies search criteria and matched-companies chart
Outreach beyond GFE

Tracked outreach, engagement, defensible documentation.

Integrated outreach & messaging

Outreach is integrated into project search to allow seamless inclusion campaigns. Each project has its own unique inbox, survey, RFP, and bid management functionality.

Vendor management

Every message, note, and response is recorded and archived within both the project's record and each client's private business directory.

Good faith efforts

A standardized, transparent process. Owners ensure their developers and contractors are connecting with available certified firms and providing opportunities to participate in every scope of work.

Project messaging stats with outreach timeline and breakdown by certification type
Dynamic analytics

Data visualization and analytics that reveal new insights and drive better decisions.

Improving return on investment, utilization, and capacity building — layered with project, performance, political, and census data, then surfaced through 3D maps and configurable dashboards.

Senate district analytics — demographics, MWBE utilization, workforce, and firm map
Visualization

3D mapping tools help visualize availability, opportunities, and impacts by district, ZIP, and project portfolio.

Reports

3D maps and analysis visualize performance and opportunities for data‑driven decision making — at the project, program, and portfolio level.

Risk management

Tools track progress, warn of projects at risk, and recommend mitigation strategies in real time.

Reporting impact

Reports tailored to every stakeholder.

AXI's report‑building wizard lets teams customize the look, feel, and content of every report. Tailored reports showcase impact across economic, political, and social layers to all internal and external stakeholders — from local politicians to the Board of Directors.

Pick from a library of templates and further customize with your organization's images and palettes. Adjust elements to your preference; AXI never charges by the hour.

Senate District
Assembly District
Congressional
City Council
County
ZIP
Sample AXI Regional Impact Performance report
Integrations

Works alongside the systems your team already uses.

AXI integrates directly and via API with the procurement, certification, ERP, and project‑management systems most agencies, authorities, and contractors already rely on.

Contact us
Security & reliability

Built for the standards public agencies demand.

AXI is designed and operated for the audit posture state agencies and authorities require — with encrypted data, role‑based access control, and a defensible audit trail across every transaction.

Reach out for more IT‑specific details
SOC 2 Type II

Audited annually. Reports available under NDA.

Encryption

AES‑256 at rest, TLS 1.3 in transit. KMS‑managed keys.

SSO & RBAC

SAML and OIDC. Granular roles per project, portfolio, and report.

FOIL / Audit ready

Retention, redaction, and request‑response workflows for public records.

99.9% uptime

Trailing‑twelve‑month availability across the AXI platform.

Backups & DR

Continuous backups, point‑in‑time restore, and multi‑region DR.

See how AXI handles complex and diverse portfolios, from end to end.